We completed the modernization of the structured cabling system at the Severnaya and Yuzhnaya CHPPs of TGC-1

The specialists of the SVEGA-Computer company completed the modernization of the structured cabling system at the Severnaya and Yuzhnaya CHPPs of TGC-1

For reference: TGC-1 is the leading producer of electricity and heat in the North-West region of Russia. It operates 52 electric generating stations in four regions of Russia: St. Petersburg, Republic of Karelia, Leningrad Oblast, and Murmansk Oblast.

Despite the restrictions imposed during the coronavirus pandemic, our company, being a continuously operating organization, did not stop its activities. We realized the importance of the tasks assigned to us. A significant amount of work has been completed:

The following systems were installed at the Yuzhnaya CHPP of TGC-1:

  • local computer network (37.3 km of twisted pair cable was laid; 3.4 km of optical cable, subscriber sockets were installed at 738workplaces);
  • telephone distribution network (22.1 km of telephone cables with various numbers of pairs were laid, telephone sockets were installed at 425 workplaces);
  • dedicated electrical distribution network (12.1 km of power cables of various cross-sections were laid, 750 electrical outlets were installed).
  • Photo source - official site of TGC-1

    The following systems have been installed at the Severnaya CHPP of TGC-1:

  • local computer network (31.1 km of twisted pair cable was laid; 5.7 km of optical cable, subscriber sockets were installed at 632 workplaces);
  • telephone distribution network (7.1 km of telephone cables with various numbers of pairs were laid, telephone sockets were installed at 41 workplaces);
  • dedicated electrical distribution network (2.3 km of power cables were laid, 156 electrical outlets installed).
  • Photo source - official site of TGC-1

    All the specified volumes of work performed are confirmed by the relevant regulatory documents, in particular, acceptance certificates (Form KS-2).